Project Details

Major Bridge

  • TOTAL SPAN/ LENGTH:
  • Main:8x22.5m = 180m
  • DECK WIDTH2x16.5m
  •  PSC Girder (Post Tensioned - Precast)
  •  6 Girder system with Direct Support
  •  Wall type Abutment & Pier
  •  Pile Foundation (10 / 12 Pile group)
  •  Bridge over Siswan River
  • Client: GMADA
  • Location:Chandigarh
  • Status:Ongoing, Near Completion